These are as-is pictures from the first day.
The first order of the day was to remove the builder installed blanket insulation. This is standing near the stairs and looking into the main area.
My able assistant Kraij, getting started on the insulation
Looking into the furnace room from the stairs. The previous owner had attempted to complete the basement on their own. The steel framing has to go and the furnace will be moved a foot and the A/C unit flipped in order to clear the window and optimize the space.
The stairs are builders grade pine.
The far corner is the planned location for the washroom. A stack in the far corner will have to be relocated to accommodate a full 32 x 60 shower.
The lower half of the insulation was falling off
More steel framing against the blanket insulation. What a waste of space
The return air duct in the ceiling from the upper level will have to be relocated
View towards the furnace room and the cold room door
Another view
The plumbing stack in what will be the bar area. This entire stack is slated for a 'makeover'!!!
Dhiraj
If you are looking for solutions for your home, contact us about our design, build & decorate services.
Dhiraj
If you are looking for solutions for your home, contact us about our design, build & decorate services.
No comments:
Post a Comment