Just had some pictures on hand of the build progress. This build has taken longer than anticipated on account of the additions to the scope of work as we progressed. Besides that, I am working alone and I think that I overestimated my own capabilities.

However it is progressing well and should be quite the basement when completed.

 All framed, insulated and vapor barrier installed. Cabling for front, rear and centre speakers were installed along with the HV wiring  

This is the build out for the Television, Electric Fireplace and Centre Channel speaker. I took care to build it out in line with the bulkheads. This way everything is streamlined. Also visible in the picture is tubing that was installed to pull cabling from the Media Cabinet that will be installed in the left hand corner of the room.

I tried to minimize the impact of the bulkheads in the room. This one in particular, I got my plumber to reverse the piping, thereby maintaining a smaller bulkhead instead of a tall one.

Looking towards the Laundry Room. 

Drywalled. The left side bulkhead is a dummy installed to maintain symmetry. The resultant look is one of a coffered ceiling. Dedicated circuits were installed for the heater and the television.

 Looking toward the rear of the basement. Double doors at the top and bottom of the visible openings will offer access to the Electrical panel as well as storage at the bottom.

Looking into the Laundry Room. This room will also house the freezer in addition to the Laundry Pair and the Laundry sink. Mike, my plumber, installed a laundry box that streamlines the inlet and outlet of the Washing Machine.  Not visible in the picture is the Utility room that houses the Furnace  and the Water Heater. I built this tight, but the entire space is accessible via 2 sets of Double Bi fold doors.

That's Peter, who's done the taping in most of the basements that I've built.

 And that's Anthony working the Bazooka. If you're into tools as I am; the woody is understandable....

Dhiraj

If you are looking for solutions for your home, contact us about our design, build & decorate services.

Thursday, February 2, 2012

Basement Build - Oakville

Today is the first real day that I've had at home alone since the beginning of December. And that's because the Tapers have taken over my build. I've not had much time to blog as I would generally make it home after 8 on most days.

So here are pictures of the basement as it was on the day that I started the build. Pictures are from my phone and hence the poor quality.

The stairwell into the basement. I built out the wall to the right to equalize both walls. The area under the stairs will be a double door closet to accommodate the Home Owner's treadmill when entertaining. The little alcove will be a small coat or storage closet.   

Looking towards the Pool Table area. The alcove at the far end will hold a 'Bar Shelf' for drinks to be set down upon. 

The Basement Washroom rough plumbing. This was in the worst place possible. We dug out the floor and removed the existing plumbing and sealed the pipes.

 Looking towards what will become the Media Wall in the Home Theater Area.

The existing laundry room and furnace room. The plan is to build a dedicated laundry room complete with concealed plumbing and ducting and a counter top above the laundry pair, thereby giving the space dual functionality when entertaining. 